Initial teleconference with ALOHA Observatory Group:
Attendees:
- MBARI
- Kevin Gomes
- Duane Edgington
- Bob Herlien
- ALOHA
- Fernando Santiago-Mandujano
- Paul Lethaby
- Jeffrey Schneider
Other contacts:
- Pat Thompson (I.T. Support for SSDS machine)
- MARS Team (ALOHA group was interested in contacting MARS team through Etch)
Notes:
- Deployment on ALOHA Cabled Observatory
- Early January 2011
- Instruments:
- SBE37s (two of them)
- Array of thermistor SBE39s (10 of them inductively)
- ADCP (Sontek 250kHz), probably be getting an RDI deep water monitor
- BB2F
- Two hydrophones (probably not managed through SIAM and SSDS)
- One video camera (not defined), assume video servers (probably not managed through SIAM and SSDS).
- They connect instruments to serial port terminal server (digi 4 port server).
- The deployment will be at 5000m depth
- They would like to use SSDS to do data management
- Would like to use SIAM to communicate with sensors.
- DataTurbine is of interest to the ALOHA guys and they would use it.
- They do not have PUCKs on their instruments, we said no problem.
- They are interested in Adaptive Sampling (automated).
- We felt this might be a good opportunity to get a constrained, real-world use case for adaptive sampling.
- They were interested in documentation for SIAM and its integration with DataTurbine
- Sample rates for instruments on average around once a minute (or a little less).
- Bob (for SIAM) and Kevin (for SSDS) will be the points of contacts for MBARI<->ALOHA interactions.
Timeline:
More details to come from ALOHA group, but some timeline notes:
- Ship time is January
- They want test system in lab ASAP (they actually have some of it running currently)
Action Items:
- Kevin will look back and try to get SSDS install going again on kainani.
- ALOHA group will send Bob information about instruments (IP addresses, etc.)
- Bob will look into getting SIAM running against their instruments.
- ALOHA group will work on generating a timeline with milestones like code freeze, integration and test, etc.
NOTE: As long as the time is not huge, we can charge to TTOS.
|